Stuart Pepper Middle School
Brandenburg, KY
Stuart Pepper Middle School needed a solution to their sink hole and soil settlement issues. Haire’s team was hired to pump 400 cubic yards of concrete in 213 injection points. This method of soil stabilization gave the engineers a strong enough foundation to build a new state of the art gymnasium above.