The John Black Aquatic Center Renovation was an over $4 million project located at 1551 N KY-393 La Grange, KY. Haire Construction was contracted to place concrete for the new pool deck and two additional sidewalks. The pool deck was over 20,000 square feet and included over 30 deck drains that needed the correct slope to effectively remove water from the deck. Concrete sealant and tile depth markers were installed by Haire after the concrete was placed. Haire Construction was delighted to participate in this project with Oldham County and contribute to the opening of the pool for the community.