Anchorage Bridge


Haire Construction was contracted out by the City of Anchorage, KY to construct a masonry pedestrian bridge over a small drainage ditch in honor of their retiring mayor. Haire installed a RCP (Reinforced Concrete Pipe) to allow for passage of water under the bridge. From there, four columns and a headwall were constructed, then the actual sidewalk was installed going over the pipe. Once the concrete work was completed a Limestone veneer was installed as well as a plaque dedicating the bridge to the mayor of Anchorage.