Indiana University Southeast, we were to demo the existing sidewalks and pour new exposed aggregate. There was a little bit of masonry work we had to repair to match existing brick, pour new pads around flagpoles and dig in new sleeves for irrigation. Along with this, we were to remove the old clock tower and all the electrical work in the area. Dig, rebar and pour new light pole bases, run new electrical work for these light poles and other ground receptacles and re-install the old clock tower with now power ran to the clock. There were two large circular areas that required a different finish and called out a color concrete that had to be perfectly sliced into symmetrical pieces. This was a fun job to work in the summer months, we finished ahead of schedule and there were no complaints.